Global Electric Power Construction Company (GEPCO) provides the Complete Installation testing and commissioning of MV/LV Switchgear’s Power Transformer, Power Panels, RMU, MCC, Power Cables HV/MV/LV Cables (laying, testing and Termination), Fiber Optic Cable Splicing, UPS Batteries, GIS Bus Bar, Bus Duct, Over Head Transmission Line, Street Lighting, Fence Lighting Fixtures and High mast lighting system. Cable tray, Cable ladder System and all related electrical works.

High Voltage:-

• Installation of Switchgears
• Laying of Power Cables
• Installation of Transformers
• Cable jointing
• Cable containment systems
• Pilots & Communication cables associated with HV Systems
• Laying of HV cables, jointing and termination, cable fault
location and restoration etc.

Medium Voltage:-

• Installation of Switchgears (Voltage range 415V – 132 KV)
• Installation of Substations with RMUs, Transformer & switchgears
• Installation of Power Distribution System
• Installation of Transformers
• Installation of Motor Control Centers (MCC’s)
• Installation of Panel Boards.
• Installation of bus bar systems
• Design & installation of Lighting Systems
• Design & installation of Earthing & Lighting Protection System
• Battery Inverters and UPS System
• Erection & installation of Electrical Equipment,
Sensors & Instruments.

• Protection, power management, Supervisory Control and Data Acquisition system.

• Laying of LV/MV cables up to 66KV, jointing and termination, cable fault location
and restoration etc.

Cable Installation & Jointing:-

Global Electric Power Construction Company (GEPCO) specializes in cabling associated with electrical distribution systems.

• Cable Installation
• Cable jointing
• Cable containment systems
• Pilots & Communication cables
associated with MV /HV Systems
• Low voltage works

• Skilled technicians and well experienced engineers are prime requisite in successful installation of process instruments.

• GEPCO has such personnel along with latest testing equipment’s for installation of central control room, field mounted instruments, trunking, cabling/wiring, termination and tagging, piping and tubing for air supply and signal, loop checking & hooking up, testing, calibration etc.

Testing & Commissioning:-

• Global Electric Power Construction Company (GEPCO) has technocrats, equipment and knowhow for all pre- commissioning and routine testing of installed equipment /instruments, switchgears, control and automation system etc.
• Calibration of protective relays and measuring instruments. test of transformers , switchgear and MCC, CT, PT, protection and control relays.
• Instruments are Configured & calibrated using standard test equipment and testing methods and procedures.
• All circuitry and functionality tests are carried out.

Utilizing our experienced site engineering staff, GEPCO offers a competent
‘hands on’ test & commissioning service.

Testing & commissioning is probably the most fundamental part of any project. It is usually the last item on agenda & is the final proving, prior to handover to the client.

It is a demonstration, that the design intent, has successfully progressed, from paper through to reality & that the equipment & integrated schemes, safely operate as intended.
Both old & new equipment needs testing to provide client assurance that when there is a fault, not only will it clear safely, but also the equipment can contain it.

We are capable of carrying out most testing requirements.
Electrical tests can be classified as; Development tests, Type tests, Routine tests, Reliability tests, Commissioning tests. Reliability & Commissioning tests are the site tests & performed after installation of new electrical systems.

Transformers:-

We can perform the following tests for transformers;

• Transformer turns ratio test (TTR) • Transformer winding resistance
• Dissipation factor
• Insulation resistance
• Short circuit impedance test
• Pressure test
• All test for auxiliaries of transformer

Switch Gears:-

We can perform the following tests for Switch Gears;

• Circuit breaker timing
• Circuit breaker contact resistance • High voltage test
• Insulation resistance
• Mechanical checks
• Control circuitry
• Motor charging current

Protection & Control of Electrical Equipment:-

We can perform the following tests;

• Differential relays
• Over current, ground fault & short circuit
protection relays
• Synchro check relays & Generator protection
relays
• Auto voltage regulation
• Breaker failure relays